The Uptime Wind Energy Podcast

GE Vernova and Vineyard Wind Settle, UK Approves Irish Sea Cables

The Uptime Wind Energy Podcast

Show Notes

GE Vernova and Vineyard Wind drop all claims in their $4.5 billion dispute. Plus the UK approves Irish Sea cables for Morgan and Morecambe, a GE turbine order in Japan, whale recorders in the Celtic Sea, and previews of WindEnergy Hamburg.Register for the SkySpecs Customer ForumMeet with Nikki Briggs at WindEnergy Hamburg to discuss the StrikeTape Ultra LPS upgradeFind Rosie & Matthew at Booth A1-115 at WindEnergy Hamburg

The Uptime Wind Energy Podcast is brought to you by Weather Guard Lightning Tech, creators of the StrikeTape Ultra LPS retrofit. Subscribe to Uptime’s Substack newsletter. And check out Rosemary’s "Engineering with Rosie" Youtube channel. Have a question we can answer on the show? Email us!

Episode Transcript Speaker: [00:00:00] The Uptime Wind Energy podcast, brought to you by StrikeTape. Protecting thousands of wind turbines from lightning damage worldwide. Visit StrikeTape.com. And now your hosts

Allen Hall: Welcome to the Uptime Wind Energy podcast. I'm Allen Hall here with Rosemary Barnes and Jelanta Padron. And f- first off, Rosemary is in Denmark in preparation to visit Wind Energy Hamburg.

Rosemary Barnes: I am. I'm in, uh, Ringkøbing, which is on the west coast of Jutland. Just, uh, took the, a train and hired a car from Copenhagen.

Drove past a whole lot of wind turbines. It's very nice to be back.

Allen Hall: So the Wind Energy Hamburg event is the event, in my opinion. There's really two, right? Wind Europe and Wind Energy Hamburg. Uh, Husum is a big event, but not of the scale of Wind Energy Hamburg. I think they're [00:01:00] predicting 40-ish thousand people probably are gonna come through the event.

It's massive. Have you been there before, Rosemary?

Rosemary Barnes: I haven't. I've only been to WindEurope once, and other than that I've been to some big composites conferences back when I was doing my PhD, but I'm kind of, like, 'cause y- when I went to WindEurope last year, that was my first big wind energy conference, and I was so overwhelmed.

I walked in the door, I saw the exhibition, and within 90 seconds all the energy had drained from my body and I'm like, "I wanna go home now." But, um, so I've kind of like, I, I have just, I've spent a couple of days in, in Copenhagen and surrounds and, um, and that, that was really good. Lots of talking, lots of seeing stuff, and I'm sure we'll talk about that in a minute.

Um, but now I have preemptively, like, taken myself to a quiet corner of Denmark to just, yeah, like, put my, put my head down and, uh, yeah, have some quiet activities, some n- nature. The nature is really nice over this [00:02:00] part of Denmark. There's lots of... Like, I wanna go for some long runs in sand dunes and heaths and, um, yeah, planning to drive up to Østerild where there's a big wind turbine test center.

Uh, I just wanna see what's there just out of pure, pure geekiness, see what's there, 'cause y- you know, like, there's new, new stuff there, right? And there's often, like, offshore wind turbines being tested. I don't know what's there. That'll be cool to see. Um, and yeah, I'm trying to put together a video about how wind turbines are tested, so that will be part of it and, yeah, potentially a good recording location.

So yeah, just a bit of quiet time, trying to rest up ahead of next week where I know that there will be just so many conversations. I love, I love talking about wind energy technology, and I love catching up with old people that I know, but I just, I'm not an extrovert. Um, yeah, at best an ambivert maybe, slightly introverted.

I was actually discussing this with somebody, how, like, inappropriate it is to have such [00:03:00] sensory overload at, um, a conference that is mostly attended by engineers. It's, like, we're not known for being, you know, like, really social people. Um, and we came up with the idea that there should be, like, a what? A sensory deprivation room in there where, um, you know, you can just go in and like- Oh my

More from The Uptime Wind Energy Podcast

Oct 22, 2026

This week we’re revisiting our discussion with Andrew Davis of Tightline Composites and Brad Schmidt of Avient, who discuss a resin additive that eliminates peel ply on carbon planks.

Oct 20, 2026

Nordex Q3 orders jump 30% and Vestas lands about a gigawatt in Australia. Plus why turbine factories skip Australia, high project costs, and whether batteries can replace coal.

Oct 19, 2026

Allen covers the Trump administration’s bid to reopen Revolution Wind’s permit, a bipartisan Senate permitting deal, Nordex’s doubled third-quarter profit, and GE Vernova’s new wind chief.

Oct 15, 2026

Jeremy Heinks, founder and CEO of CICNDT, joins to discuss the inspector shortage, Level III oversight, blade samples, drone thermal limits, and IEC updates.

Oct 13, 2026

Vestas CEO Henrik Andersen says China barred Vestas from monitoring its own turbines. Plus Ørsted takes heat for Chinese monopiles, India’s blade design gap, and tents that beat weather delays.

See all episodes →