
Show Notes
AI ambition is colliding with physical reality.
As data centers push from 20-kilowatt racks to 120-kilowatt systems—with megawatt-per-rack infrastructure on the horizon—the limits of power and cooling have become impossible to ignore.
In this episode of Innovation Heroes, Ed McNamara explores the collision between AI ambition and energy reality with two guides who see the problem from opposite ends of the timeline.
Brian Smith of Idaho National Laboratory takes us inside the nuclear renaissance, where small modular reactors are being designed to deliver massive, carbon-free power on dramatically shorter timelines—"like building airplanes, not airports."
Meanwhile, Ryan Hotchkin of SHI International brings the conversation back to today's constraints: liquid cooling becoming mandatory, power capacity maxed out, and cloud costs rising for everyone.
Together, they map what IT leaders need to understand now—and what's coming next—if AI initiatives are going to scale instead of stall.
Key Takeaways:
Why AI workloads are overwhelming traditional data center power and cooling
How small modular reactors could reshape long-term energy infrastructure
The math problem: power density doubling every generation of GPUs
What IT leaders must do now—even if deployment is three years away
Listen on Apple Podcasts, Spotify, or watch on YouTube shi.com/heroes
#AI #DataCenter #NuclearEnergy #ITInfrastructure #Innovation
Guests:
Brian Smith — Nuclear Reactor Development Director, Idaho National Laboratory
Ryan Hotchkin —Sr. Director, Advanced Solutions Group, SHI International
Related Resources:
SHI’s Next Gen Infrastructure Solutions: https://www.shi.com/solutions/next-generation-infrastructure
SHI GenAI Solutions: https://www.shi.com/solutions/generative-ai
More from Innovation Heroes
A decade of better tools. Better services. Better data. And yet the same statistic keeps showing up: 25-30% of enterprise technology spend is wasted. Why can't anyone move the needle?
Everyone’s talking about AI that writes code and answers questions. But what happens when AI has to operate in the physical world, where mistakes don’t just generate weird sentences, they have real consequences?
The encryption protecting your most sensitive data has as an expiration date. Nation-states are harvesting encrypted traffic right now, stockpiling it until quantum computers become powerful enough to crack it in seconds.
State and local governments are under pressure to deliver modern services, but budgets, staffing shortages, and long procurement cycles make innovation feel impossible. In this episode of Innovation Heroes, host Ed McNamara talks with three leaders proving that AI-powered Smart Cities aren’t a futuristic concept. They’re happening now.
Enterprises are spending thousands — sometimes millions — on AI productivity tools. But for many, the big question remains: Are we getting what we paid for?