Show Notes
On Dec. 22, 2008, a major dike failure occurred on the north slopes of the ash pond at the Tennessee Valley Authority’s (TVA’s) Kingston Fossil Plant. The failure resulted in the release of approximately 5.4 million cubic yards of coal ash spilling onto adjacent land and into the Emory River. The Kingston spill is considered one of the most significant and costly events in TVA history. In a project completion fact sheet issued jointly by the U.S. Environmental Protection Agency (EPA) and the TVA in December 2014, it says the cleanup took about six years, required a total of 6.7 million man-hours, and cost $1.178 billion. TVA hired various contractors to perform the post-spill cleanup, removal, and recovery of fly ash at the Kingston site. Perhaps most notable among them was Jacobs Engineering. TVA hired Jacobs in 2009 specifically to provide program management services to assist with the cleanup. Jacobs claims to have “a strong track record of safely managing some of the world’s most complex engineering and environmental challenges.” It has noted that TVA and the EPA’s on-scene coordinator oversaw the worker safety programs for the Kingston cleanup, approving all actions in consultation with the Tennessee Department of Environment and Conservation. Jacobs said TVA maintained rigorous safety standards throughout the cleanup, and that it worked closely with TVA in following and supporting those standards. Jared Sullivan, author of Valley So Low: One Lawyer’s Fight for Justice in the Wake of America’s Great Coal Catastrophe, studied the Kingston cleanup and followed some of the plaintiffs for more than five years while writing his book. As a guest on The POWER Podcast, Sullivan suggested many of the workers felt fortunate to be employed on the Kingston cleanup. The U.S. economy was not thriving at the time; housing and stock markets were in a funk, and unemployment was relatively high. “These workers—these 900 men and women—this disaster is kind of a godsend for them as far as their employment goes, you know. A lot of them needed work. Many of them were very, very pleased to get this call,” Sullivan explained. “The trouble is that after a year or so of working on this job site—of scooping up and hauling off this coal ash muck from the landscape, also from the river—they start feeling really, really terribly,” he said. “At first they kind of write off their symptoms as overworking themselves. In many cases, these workers were working 14-hour shifts and just pushing themselves really, really hard because there’s a lot of overtime opportunities. So, that was good for them—that they could work so much, that this mess was so big,” Sullivan continued. But after a while, some workers start blacking out in their cars, having nosebleeds, start coughing up black mucous, and it becomes clear to them that the coal ash is the cause. Jacobs reports several contractors’ workers at the Kingston site filed workers compensation claims against their employer in 2013. These workers alleged that conditions at the site caused them to experience various health issues that were a result of excessive exposure to coal ash. Jacobs said many of these claims were found to be unsubstantiated and were rejected. Then, many of the same workers filed lawsuits against Jacobs, even though they may not have been Jacobs employees. Jacobs says it stands by its safety record, and that it did not cause any injuries to the workers. “The case resolved early last year, after almost 10 years of litigation,” Sullivan said. “Jacobs Engineering and the plaintiffs—230 of them—finally settled the case. $77.5 million dollars for 230 plaintiffs. So, it works out to a couple hundred thousand dollars each for the plaintiffs after the lawyers take their fees—so, not tons of money.” In a statement, Jacobs said, “To avoid further litigation, the parties chose to enter into an agreement to resolve the cases.”
More from The POWER Podcast
In this episode of The POWER Podcast, Sandeep Kumar Gupta, sales director with Siemens Energy Gas Services, and Naira Elsayed, a senior project manager with Elsewedy Electric Power Systems Projects (PSP), discuss the Rabigh Reinforcement Combined Cycle Power Plant, a finalist for a 2026 POWER Top Plant Award.
Utilities and independent power producers have spent years adding sensors to their generating fleets and creating dashboards to view what they relay. But visibility into how a plant is operating isn’t the same as knowing what to do about it—and that gap is where Siemens Energy’s Omnivise Energy Management System is increasingly shedding light, explained two of the company’s experts as guests on The POWER Podcast. “Monitoring is just telling you what’s happening,” said Sarah Dietrich-Smith, Siemens Energy’s commercialization manager for Omnivise Energy Market and Fleet Management Solutions, “and Energy Management is telling you what should happen next, and it helps you to execute that decision,” she explained. The distinction, she said, is the real difference between tracking a plant’s condition and actually optimizing it—moving “from just this visibility to true optimization that you can actually take action on, and optimization that’s based and tied to measurable business outcomes.” From Single Assets to Whole Fleets Katie Hanley, head of Siemens Energy’s Omnivise Energy Market and Fleet Management Solutions team, framed Energy Management as fundamentally a question of business outcomes. Given a plant’s generation commitments, gas hedging position, and access to additional electricity markets, “What are the optimized economics for running your plant or your fleet?” she asked. “Historically, assets were managed individually. They really only cared about the question, ‘How can we get the single asset to perform better?’ ” Dietrich-Smith said. “We want to move into a fleet optimization mindset.” One plant might be constrained while another has more flexibility—sometimes for regional reasons, such as differing prices or curtailment risk in different markets. “This fleet-level approach is what’s going to help operators allocate flexibility, manage this risk, and ultimately optimize the commercial performance across the full portfolio,” she said, “instead of just making that isolated asset or site-level decision.” Dietrich-Smith also pushed back on a common assumption about where the value comes from. “I think the most common misconception is that the only value we’re bringing is efficiency improvement,” she said. Customers also see fewer penalties, more effective participation in electricity markets, and faster response to changing conditions—benefits she summed up simply: “Time is money.” Renewables Complicate the Math A growing share of that fleet-level complexity traces back to renewables, Hanley said, whether a customer operates a hybrid portfolio directly or simply competes in a market where renewable penetration is rising. She described thinking in terms of dispatchable versus non-dispatchable generation: as more renewables come online, dispatchable options become scarcer, making it harder to maintain grid stability—and more important to predict when instability might occur. That prediction problem pulls in weather and market data alike, from cloud cover and wind speeds at different altitudes to real-time electricity prices. For a hybrid site with battery storage, the same data informs decisions about when to charge from onsite generation versus the grid, and when to discharge—sometimes purely to arbitrage low prices rather than to support the site’s own generation. “These batteries are creating dispatchable flexibility when normally we would only be able to do that with some of our large gas assets,” Hanley said, adding that customers are increasingly weighing a battery discharge against ramping up a plant or duct burning, based on which is the better economic call in the moment. Hanley closed the conversation on a practical note for listeners still weighing where to start. “Everything is only getting more complex, so give us a call,” she said.
Public power utilities have long promised lower bills, reliable service, and decisions made close to home—and the data still backs that up. But holding that ground is getting harder. In this episode of The POWER Podcast, Scott Corwin, president and CEO of the American Public Power Association (APPA), talks about the forces now testing the community-owned utility model. Corwin explains why resource adequacy, reliability, and affordability have converged into the defining challenge for APPA's roughly 2,000 member systems—a concern that once affected only certain regions but now stretches across nearly the entire membership. He breaks down the tools public power uses to keep rates down, including tax-exempt financing and elective pay credits, and why local control itself acts as a check on spending. The conversation also digs into the issues reshaping the sector: how smaller utilities are evaluating massive data center interconnection requests while protecting ratepayers; why Corwin describes public power's generation strategy as "any of the above" rather than "all of the above"; and the structural headwinds—permitting delays, an aging workforce, supply chain strain, and cybersecurity—that determine what utilities can build and how fast. Corwin closes with what he most wants policymakers to understand about community-owned utilities, and the value of 2,000 diverse communities speaking with one voice on affordability and reliability. Listen to the full conversation to hear how public power is navigating one of the most dynamic periods the industry has faced in years.
A perfect storm is brewing across the U.S. power generation fleet. Between 600 and 700 GE 7FA gas turbines installed during the bubble of 2000–2004—plus roughly 900 7EA units worldwide—are simultaneously approaching the OEM's 144,000-hour, 5,000-start end-of-life threshold. Superalloy forgings carry multi-year lead times. Only a handful of shops worldwide can service these machines. And the data center boom is pushing utilization higher than anyone planned for.
Duke Energy operates 11 nuclear units across six sites in the Carolinas — a fleet that produces more than half of the region's electricity year in and year out. In 2025, that fleet posted its best capacity factor on record, north of 97%.