The POWER Podcast

173. Why Data Center Developers Should Think ‘Power First’

The POWER Podcast

Show Notes

You don’t need me to tell you how artificial intelligence (AI) is impacting the power grid; you can just ask AI. Claude, an AI assistant created by Anthropic, told POWER, “AI training and inference are driving unprecedented demand for data center capacity, particularly due to large language models and other compute-intensive AI workloads.” It also said, “AI servers, especially those with multiple GPUs [graphics processing units], require significantly more power per rack than traditional servers—often 2–4x higher power density.” So, what does that mean for power grid operators and electricity suppliers? Claude said there could be several effects, including local grid strain in AI hub regions, the need for upgraded transmission infrastructure, higher baseline power consumption, and potential grid stability issues in peak usage periods. Notably, it said AI data centers tend to cluster in specific regions with favorable power costs and regulations, creating “hotspots” of extreme power demand. Sheldon Kimber, founder and CEO of Intersect Power, a clean energy company that develops, owns, and operates a base portfolio of 2.2 GW of operating solar PV and 2.4 GWh of storage in operation or construction, understands the challenges data centers present for the grid. As a guest on The POWER Podcast, Kimber suggested the only way to meet the massive increase in power demand coming from data centers is with scalable behind-the-meter solutions. “These assets may still touch the grid—they may still have some reliance on the grid—but they’re going to have to bring with them an enormous amount of behind-the-meter generation and storage and other things to make sure that they are flexible enough that the grid can integrate them without creating such a strain on the grid, on rate payers, and on the utilities that service them,” Kimber said. Yet, data center developers have not traditionally kept power top-of-mind. “The data center market to date has been more of a real estate development game,” Kimber explained. “How close to a labor pool are you? What does it look like on the fiber side? What does the land look like?” He said electric power service was certainly part of the equation, but it was more like part of a “balanced breakfast of real estate criteria,” rather than a top priority for siting a data center. In today’s environment, that needs to change. Kimber said Intersect Power has been talking to data center companies for at least three years, pitching them on the idea of siting data centers behind-the-meter at some of his projects. The response has been lukewarm at best. Most of the companies want to keep their data centers in already well-established hubs, such as in northern Virginia; Santa Clara, California; or the Columbia River Gorge region in Oregon, for example. Kimber’s comeback has been, “Tell us when you’re ready to site for ‘Power First.’ ” What “Power First” means is simple. Start with power, and the availability of power, as the first criteria, and screen out all the sites that don’t have power. “To date, data center development that was not ‘Power First’ has really been focused on: ‘What does the plug look like?’ ” Kimber said. In other words: How is the developer connecting the data center to the power grid—or plugging in? The developers basically assumed that if they could get connected to the grid, the local utility would find a way to supply the electricity needed. However, it’s getting harder and harder for utilities to provide what developers are asking for. “The realization that the grid just isn’t going to be able to provide power in most of the places that people want it is now causing a lot of data center customers to re-evaluate the need to move from where they are. And when they’re making those moves, obviously, the first thing that’s coming to mind is: ‘Well, if I’m going to have to move anyway, I might as well move to where the binding constraint, which is power, is no longer a constraint,’ ” he said.

More from The POWER Podcast

Oct 14, 2026

In this episode of The POWER Podcast, Sandeep Kumar Gupta, sales director with Siemens Energy Gas Services, and Naira Elsayed, a senior project manager with Elsewedy Electric Power Systems Projects (PSP), discuss the Rabigh Reinforcement Combined Cycle Power Plant, a finalist for a 2026 POWER Top Plant Award.

Sep 3, 2026

Utilities and independent power producers have spent years adding sensors to their generating fleets and creating dashboards to view what they relay. But visibility into how a plant is operating isn’t the same as knowing what to do about it—and that gap is where Siemens Energy’s Omnivise Energy Management System is increasingly shedding light, explained two of the company’s experts as guests on The POWER Podcast. “Monitoring is just telling you what’s happening,” said Sarah Dietrich-Smith, Siemens Energy’s commercialization manager for Omnivise Energy Market and Fleet Management Solutions, “and Energy Management is telling you what should happen next, and it helps you to execute that decision,” she explained. The distinction, she said, is the real difference between tracking a plant’s condition and actually optimizing it—moving “from just this visibility to true optimization that you can actually take action on, and optimization that’s based and tied to measurable business outcomes.” From Single Assets to Whole Fleets Katie Hanley, head of Siemens Energy’s Omnivise Energy Market and Fleet Management Solutions team, framed Energy Management as fundamentally a question of business outcomes. Given a plant’s generation commitments, gas hedging position, and access to additional electricity markets, “What are the optimized economics for running your plant or your fleet?” she asked. “Historically, assets were managed individually. They really only cared about the question, ‘How can we get the single asset to perform better?’ ” Dietrich-Smith said. “We want to move into a fleet optimization mindset.” One plant might be constrained while another has more flexibility—sometimes for regional reasons, such as differing prices or curtailment risk in different markets. “This fleet-level approach is what’s going to help operators allocate flexibility, manage this risk, and ultimately optimize the commercial performance across the full portfolio,” she said, “instead of just making that isolated asset or site-level decision.” Dietrich-Smith also pushed back on a common assumption about where the value comes from. “I think the most common misconception is that the only value we’re bringing is efficiency improvement,” she said. Customers also see fewer penalties, more effective participation in electricity markets, and faster response to changing conditions—benefits she summed up simply: “Time is money.” Renewables Complicate the Math A growing share of that fleet-level complexity traces back to renewables, Hanley said, whether a customer operates a hybrid portfolio directly or simply competes in a market where renewable penetration is rising. She described thinking in terms of dispatchable versus non-dispatchable generation: as more renewables come online, dispatchable options become scarcer, making it harder to maintain grid stability—and more important to predict when instability might occur. That prediction problem pulls in weather and market data alike, from cloud cover and wind speeds at different altitudes to real-time electricity prices. For a hybrid site with battery storage, the same data informs decisions about when to charge from onsite generation versus the grid, and when to discharge—sometimes purely to arbitrage low prices rather than to support the site’s own generation. “These batteries are creating dispatchable flexibility when normally we would only be able to do that with some of our large gas assets,” Hanley said, adding that customers are increasingly weighing a battery discharge against ramping up a plant or duct burning, based on which is the better economic call in the moment. Hanley closed the conversation on a practical note for listeners still weighing where to start. “Everything is only getting more complex, so give us a call,” she said.

Jun 29, 2026

Public power utilities have long promised lower bills, reliable service, and decisions made close to home—and the data still backs that up. But holding that ground is getting harder. In this episode of The POWER Podcast, Scott Corwin, president and CEO of the American Public Power Association (APPA), talks about the forces now testing the community-owned utility model. Corwin explains why resource adequacy, reliability, and affordability have converged into the defining challenge for APPA's roughly 2,000 member systems—a concern that once affected only certain regions but now stretches across nearly the entire membership. He breaks down the tools public power uses to keep rates down, including tax-exempt financing and elective pay credits, and why local control itself acts as a check on spending. The conversation also digs into the issues reshaping the sector: how smaller utilities are evaluating massive data center interconnection requests while protecting ratepayers; why Corwin describes public power's generation strategy as "any of the above" rather than "all of the above"; and the structural headwinds—permitting delays, an aging workforce, supply chain strain, and cybersecurity—that determine what utilities can build and how fast. Corwin closes with what he most wants policymakers to understand about community-owned utilities, and the value of 2,000 diverse communities speaking with one voice on affordability and reliability. Listen to the full conversation to hear how public power is navigating one of the most dynamic periods the industry has faced in years.

May 19, 2026

A perfect storm is brewing across the U.S. power generation fleet. Between 600 and 700 GE 7FA gas turbines installed during the bubble of 2000–2004—plus roughly 900 7EA units worldwide—are simultaneously approaching the OEM's 144,000-hour, 5,000-start end-of-life threshold. Superalloy forgings carry multi-year lead times. Only a handful of shops worldwide can service these machines. And the data center boom is pushing utilization higher than anyone planned for.

May 13, 2026

Duke Energy operates 11 nuclear units across six sites in the Carolinas — a fleet that produces more than half of the region's electricity year in and year out. In 2025, that fleet posted its best capacity factor on record, north of 97%.

See all episodes →