The Data Center Daily

Oregon Freezes Data Center Permits as DOE Waives Limits for a Strained PJM — October 14, 2026

The Data Center Daily

Show Notes

Oregon's governor has paused air and water permits for data centers until July 2027, and DOE issued a heat-driven emergency order for PJM. Plus FERC's split vote on Duke's large-load transmission rules and Microsoft's multi-gigawatt plan for its Maia inference chips.

In this episode: 1. Oregon governor orders pause on environmental permits to build or expand data centers — Banks Post https://www.bankspost.com/oregon-governor-orders-pause-on-environmental-permits-to-build-or-expand-data-centers/ 2. Data centers strain capacity across major power grid where emergency threatens blackouts in 13 US states | Daily Mail Online — Melissa Koenig, Reuters https://www.dailymail.com/sciencetech/article-16206925/Data-centers-PJM-Interconnection-power-grid-blackouts.html 3. Commissioner Chang’s Dissent in Duke Energy Carolinas, LLC Docket Nos. ER26-2691-000 ER26-2691-001 | Federal Energy Regulatory Commission — Federal Energy Regulatory Commission https://www.ferc.gov/news-events/news/commissioner-changs-dissent-duke-energy-carolinas-llc-docket-nos-er26-2691-000 4. Microsoft to expand Azure Maia system to multi-gigawatt deployments - The Official Microsoft Blog — Scott Guthrie https://blogs.microsoft.com/blog/2026/10/12/microsoft-to-expand-azure-maia-system-to-multi-gigawatt-deployments/

Follow and rate The Data Center Daily on Apple Podcasts or Spotify. Feedback? Email [email protected]

More from The Data Center Daily

Oct 23, 2026

Google expands its Voltus bring-your-own-capacity deal in PJM tenfold to 1,070 MW under a contract running through 2040, while Nvidia locks in substrate, packaging, test and optics capacity with six suppliers. Plus Bernstein's estimate that only about 35% of announced US data center capacity gets built, and a Pennsylvania county ordering a developer to stop work on a substation.

Oct 22, 2026

Entergy Arkansas and Google amend their West Memphis power deal to resolve an accounting fight over ratepayer charges while adding a 440 MW solar PPA, 1.4 GWh of batteries and new transmission. Also: Musk's 10 GW compute claim for SpaceXAI, TCEQ pulling its permit portal offline, and $35 billion of Chinese orders for an Nvidia workstation GPU.

Oct 21, 2026

PJM filed a FERC study agreement to evaluate roughly 9.6 GW of new data center load and 10.2 GW of generation at SB Energy's Flagship site in Pike County, Ohio, outside its interconnection queue. Also: AEP, X-energy and Amazon eye 960 MW of Xe-100 reactors in Indiana, Texas's data center permit freeze draws scrutiny, and Memphis deadlocks on a moratorium.

Oct 19, 2026

NiSource signs a 20-year, 1,100 MW supply deal with Microsoft, funded by Microsoft, and NERC's computational-load standards clear their final ballot. Plus AEP's $4 billion fuel cell plant for Google in Wyoming and a 7.5 GW gas campus in a Utah water filing.

Oct 13, 2026

Google lands two power paths. Indiana regulators approved AES Indiana's $1.3 billion solar, storage and wires plan for its 390 MW Monrovia campus, the first test of the state's 80% large-load cost law. Separately, Constellation will spend $4.3 billion uprating 11 PJM reactors by 890 MW.

See all episodes →