Mindful Builder

Ask the builders anything - open discussion on our thoughts about the industry

Mindful Builder

Show Notes

High-performance building is not just about premium products. It is about the system. In this episode, we sit down with Sven Maxa from Maxa Design to unpack what Passive House building really looks like behind the scenes, from airtightness targets to the practical realities of delivering high-performance homes on site. This conversation flips the usual format, with Sven taking the lead and putting us (Hamish and Matt) in the hot seat. We get into the details that actually make or break a Passive House project, including airtightness testing, verification, contract clarity, and what happens when documentation looks great in renders but does not hold up on a building site. A major theme is collaboration between the architect, designer, builder, and trades. Passive House and building science only works when the whole team is aligned early, with transparent cost planning, clear communication, and strong documentation to avoid rework, delays, and budget blowouts. We wrap by looking at what needs to change in the Australian construction industry to lift standards at scale. Better legislation, better education, and a stronger baseline for residential construction. 👇 CHAPTER MARKERS 👇 00:00 Introduction 02:18 Meet the Sponsors - Proclima 03:05 Builder's Perspective on Passive House Contracts 06:39 High Performance Homes: Products vs. Systems 14:48 The Importance of Collaboration in Construction 23:20 Challenges in Project Costing and Documentation 36:51 Feasibility Studies and Square Meter Rates 40:13 Site Inspections and Builder Reactions 41:07 Quality Control on Site Visits 41:57 Site Meeting Schedules and Coordination 43:06 Importance of Passive House Principles 44:50 Challenges in Australian Building Practices 48:54 Air Tightness and Building Performance 56:45 Biggest Mistakes and Lessons Learned 01:03:38 Favourite Projects and Memorable Builds 01:13:43 Future of Residential Construction 01:20:46 Mindful Moments for Apprentices

LINKS: Connect with Sven: Maxa Design

Our Sponsors: Proclima - https://mindful-builder.captivate.fm/proclima MEGT - https://mindful-builder.captivate.fm/megt Connect with us on Instagram: @themindfulbuilderpod Connect with Hamish: Instagram: @sanctumhomes Website: www.yoursanctum.com.au/

Connect with Matt: Instagram: @carlandconstructions Website: www.carlandconstructions.com/

More from Mindful Builder

Oct 18, 2026

“I couldn’t unsee it.” Jimmy from June Building explains how Passive House building science finally clicked, after learning through Instagram and then winning the Pro Clima Passive House Tradesperson scholarship. Today Jimmy flips the format and turns up with a notebook full of questions on Passive House for us. Questions around high-performance homes, airtightness, mechanical ventilation, and what actually changes when you start building for comfort, not just compliance. Jimmy’s background is classic chippy-to-builder with a few turns that matter. Apprenticeship in Ballarat, travel to Banff in Canada, then Melbourne across maintenance, commercial, and high-end residential before moving to the Northern Rivers in early 2020. He’s now in the first 12 months of June Building, building the plane while flying it, and trying to bring Passive House principles into a market where clients aren’t necessarily asking for certification, even though mould, humidity, and comfort issues are everywhere. We talk about why you shouldn’t lead with the “Passive House” label and instead start with the problems people already feel in their current home: drafts, noise, dust, mould, and rooms that never feel right. Jimmy asks what details cause the most challenges, and we go straight to retrofits, because nothing is square, nothing is level, and you don’t find the real issues until you start pulling things apart. We also get blunt about where builders underquote when they move into high-performance construction, and it’s labour, all labour, especially detailing, wraps, window installs, battens, and set-out. Jimmy also pushes on PHPP and how builders should use it. PHPP isn’t just a certification hurdle. It’s a pre-construction tool for optimising cost and performance, spotting overheating risk early, and avoiding the nightmare of delivering a “high performance home” that still feels uncomfortable to live in. If you’re a builder, architect, or homeowner curious about Passive House Australia, high-performance building, and what it takes to lift your standard without blowing your budget, this episode is a solid place to start.

Oct 11, 2026

You can’t build ten versions of the same house, live in them for ten years, and then pick the best one. We’re sitting down with thermal modelling specialist Cameron Munro to talk about why “model early and model often” should be a non-negotiable part of pre-construction, whether you’re chasing Passive House or just trying to build a home that actually feels good to live in. We explain what modelling is really for (direction, not perfection), how to run “what if” scenarios across glazing, insulation, shading, and floor build-ups, and why the best decisions come from cost-benefit thinking instead of intuition. We also get into the real-world gap between models and lived performance, the risk of not updating models as drawings change, and why overheating is the mistake that bites hardest when you skip the final iteration. If you want fewer ugly conversations later, this is the episode.

Oct 4, 2026

“At some point, someone’s paying for that tender.” Tendering sounds fair on paper. Same drawings, three builders, pick the best price, move on. But once you understand what it actually costs to price a job properly, and how tendering rewards omissions, risk loading, and variations, it starts to look less like a “market test” and more like a costly way to kick off a relationship. In this episode, Hamish and Matt break down what a tender really is, why the classic draw, bid, build model creates isolation and blame, and why negotiated tendering (paid pre-construction with clear costing stop points) changes the incentives for everyone. They also get into the uncomfortable bits architects and clients don’t always see: the real cost of tendering, why prices can come back wildly different, how gaps in documentation become legitimate variations, and why trust matters more than pretending you can compare builders like-for-like. If you’ve ever wondered why a project can look “fully resolved” and still blow out, or why builders hate competitive tendering, this one will probably ruffle a few feathers.

Sep 27, 2026

Good design isn’t something you look at. It’s something you live in. We sit down with James Goodlet from Altereco Design to talk about what “good design” actually means in the real world, and what a proper pre-construction process looks like when it’s done properly. We get into why comfort is more than temperature, how designers extract the details that shape the lived experience, and why due diligence and risk management need to happen before anyone starts drawing. We also break down why James brings builders in early, how he thinks about budgeting versus estimating versus contract, and why clients need clarity on exclusions and allowances instead of getting buried in noise. We talk contingency versus inflation, the feedback loop between builders and design teams that improves outcomes over time, and a simple practical fix for smoother pre-con. Whiteboard the whole timeline, agree on milestones, and make sure everyone knows who owns what. CHAPTER MARKERS 00:00 Introduction 01:27 Meet James Goodlet 02:16 Good Design Is Seen Or Felt? 03:00 Comfort Beyond Temperature (Hempcrete House) 04:12 What Comfort Actually Includes (Sound, Air, Light) 07:08 James’ Path Into Design 11:25 Why “Alter Eco” And Sustainability 12:52 Pro Clima Detail Library 14:00 Alignment First: The Real Start Of Design 17:21 The Client Questionnaire (Sleep, Routines, Storage) 21:46 Due Diligence Before Sketching 28:10 Choosing Builders Based On Fit 37:00 Budgeting vs Estimating vs Contract 42:45 Contingency And Inflation 48:22 How Designers Read Trade Breakdowns 49:00 The Feedback Loop With Interiors

Sep 20, 2026

A proper site visit isn’t a stroll around the block. It’s where you catch the stuff that turns into $30k surprises later. We’re back with Brad from Sanford Buildco to have a conversation about what a site visit should actually involve, and why doing it properly is one of the simplest ways to protect your time, your margin, and your sanity. We break down how our checklists differ across inner-city and rural sites, but still cover the same core categories: access, services, water management, demolition risk, and the existing building. We talk through real examples like tram and train line constraints, construction zones and parking permits, combined drains, earthenware stormwater, boundary trap upgrades, three-phase power, septic fields, and when a sump and pump becomes the only option. We also get into the stuff that catches builders out if you don’t look early: neighbour water issues you can’t control once you’re hard on the boundary, asbestos you can’t spot from photos, and demolition rule changes that can turn normal waste into hazardous waste overnight. The theme is simple: gather better information now, and you’ll have fewer ugly conversations later.

See all episodes →