(Em português) A Equinix investiu mais de US$3 bilhões no Brasil e está executando 4 obras simultaneamente, incluindo uma instalação focada em IA. Victor, Presidente da Equinix Brasil, detalha os R$1,5 bilhão investidos em 12 meses, por que a reforma tributária sozinha não vai impedir que 60% das cargas de trabalho sejam processadas fora do país, e como a primeira nuvem de IA do Brasil triplicou sua capacidade em 6 meses.

Equinix has invested $3B+ in Brazil and is running 4 builds at once, including an AI-focused facility. Victor, President of Equinix Brazil, breaks down the R$1.5B spent in 12 months, why tax reform alone won't stop 60% of workloads from going offshore, and how Brazil's first AI cloud tripled capacity in 6 months.

More from datacenterHawk

Oct 13, 2026

Tammy and May of STT GDC Vietnam on what changed inside a Ho Chi Minh City data center in one year: racks from 15kW to 30kW, 100kW liquid-cooled requests, and deals that now run on import law. Why Vietnam isn't short of power, why it needs a one-stop investment agency, and when its first hyperscale project could break ground. Hosted by datacenterHawk's Arvinth S.

Aug 26, 2026

Ankit Saraiya, Director & CEO of Techno Digital Infra Pvt. Ltd., on why power - not silicon - is India's real AI-infrastructure advantage: sourcing electricity near six cents, running Chennai on 98% renewables, a 102-city edge network on railway fiber, and why he says India has "no global match." Hosted by datacenterHawk's Dedi Iskandar.

Aug 18, 2026

Mike Netzer and David Liggitt on the first half of 2026: 13.2GW leased in the US against 15.6GW for all of 2025, 1GW asks becoming 4GW asks, Europe's first multi-100MW quarter, 2GW leased across APAC, and why signed deals don't always get built. A global midyear market update from datacenterHawk.

Aug 13, 2026

Ronald Setiawan, Director of Operations at IndoData Data Centres, on the move to full Salim ownership: why local speed beats a two-year build, why he built south of Jakarta for cheaper power, why he's an operator who won't sell, and the ~2,000MW waiting in Bintan & Batam.

Aug 11, 2026

Luke McKinnon, SVP & MD Asia at NextDC, on the strategy behind KL1 - Peninsular Malaysia's first Tier IV data center: why building for every segment beats single-tenant, why retail yields 3–4x hyperscale, the neo cloud “20MW in three months” problem, and a 150MW KL2. Recorded at DCD Connect APAC, Bali. Hosted by datacenterHawk.