The Green Blueprint

How “Black Sand” could help build a domestic battery supply chain

The Green Blueprint

Show Notes

When David Fauvre and his co-founder entered the battery space in 2015, they started as brokers exporting American battery waste to recycling partners in Korea and Japan. But as the industry grew, shipping companies increasingly refused to transport the hazardous materials, making it clear that the U.S. desperately needed its own domestic processing capabilities.

Rather than attempting to build a fully integrated, end-to-end "closed loop" recycling system—an incredibly complex and capital-intensive endeavor—Blue Whale Materials is focusing on doing one thing exceptionally well: pre-processing. Using a specialized thermal system to burn off impurities, the company liberates critical minerals like cobalt, nickel, and lithium from battery foils to create a highly concentrated product they’ve trademarked as “Black Sand.” This premium material is designed to seamlessly integrate into the supply chains of downstream refiners.

After proving their technology with a demonstration plant in Japan, Blue Whale secured private equity funding and recently commissioned its first full-scale commercial facility in Bartlesville, Oklahoma.

In this episode, host Lara Pierpoint talks with David about the capital-intensive reality of building industrial infrastructure outside the venture capital ecosystem, how an outdoor battery fire at their facility forced a major overhaul of their emergency response protocols, and how a $110 million expansion project backed by the Department of Energy is accelerating their roadmap.

Credits: Hosted by Lara Pierpoint. Produced and edited by Ross Kenyon, Anne Bailey, and Stephen Lacey. Sean Marquand is our technical director. Stephen Lacey is our executive editor.

The Green Blueprint is a co-production of Latitude Media and Trellis Climate. Subscribe on Apple, Spotify, or anywhere you get podcasts. For more reporting on the companies featured in this show, subscribe to Latitude Media’s newsletter.

More from The Green Blueprint

Oct 21, 2026

This week, we’re presenting a drop-in episode of Critical Capital, a new partner podcast from Crux and Latitude Studios.

Oct 7, 2026

While living in Delhi, Sorin Grama gave a window air conditioner to an employee. He found out weeks later she wasn't using it because the electricity costs were too high. It was a stark reminder that access to global cooling isn't about upfront equipment costs. It’s about the high electricity costs needed to run air conditioners.

Sep 9, 2026

“Good fires" naturally regenerate forests. But a rise in high-severity blazes in the American West are leaving behind barren moonscapes filled with dead trees. These scorched trees act as hazardous fuel for future fires, but clearing them to replant the landscape is astronomically expensive. Add to that a massive shortage in the conifer seed supply chain, and land managers simply don't have the resources to regenerate these forests on their own.

Aug 26, 2026

To build the physical infrastructure of the clean energy transition — from wind turbines and grid stabilization to massive new AI data centers — the world needs more copper between now and 2050 than humanity has produced in its entire history. But new copper mines take anywhere from 10 to 16 years to permit and build, meaning we’re not on track to meet our rapidly growing demand.

Aug 12, 2026

For decades, the promise of new nuclear power in the West has been stifled not by the technology itself, but by the “construction problem.” Massive, multi-billion dollar mega-projects plagued by schedule creep and labor shortages have made nuclear a financial non-starter for commercial project finance.