In the latest episode of Uptime with DCK, we take a detailed look at liquid cooling with Dattatri Mattur, director of hardware engineering at Cisco.

With upcoming server CPUs expected to consume around 400W of power, GPUs already consuming more than that (Nvidia’s H100 requires ~700W per board), and with terabytes of memory per server, the cutting-edge IT workloads of the future will be almost impossible to cool with air alone.

In this podcast, we discuss thermal design points of modern processors, the cooling requirements of edge computing, and the impact of new technologies on power consumption.

We also look at some of the barriers facing the wider deployment of liquid cooling, and the enduring importance of server fans.

“This is going to take some time,” Mattur told Data Center Knowledge. “This is not an overnight, forklift change to the entire data center.”

More from The Data Center Podcast

May 9, 2022

In the latest episode of Uptime with Data Center Knowledge, we look at the evolution of bare metal servers.

Mar 8, 2022

In the latest episode of Uptime with DCK, we investigate the skills crisis facing the data center industry with Nabeel Mahmood, an experienced IT executive, keynote speaker, and one of the hosts of the Nomad Futurist podcast.

Feb 22, 2022

Hello there, or shall I say, welcome back? Six months after our last episode with DCK’s illustrious Yevgeniy Sverdlik, we are relaunching the podcast, under the working title ‘Uptime with DCK.’

Aug 4, 2021

The former infrastructure head at eBay and Uber talks about his first year on the vendor side, VPS’s technology vision, the largest data center operators' efforts to get to zero carbon, and Infrastructure Masons' work to improve the industry's new-talent pipeline.

See all episodes →