Catalyst with Shayle Kann

Is now the time for DERs to scale? [re-published]

Catalyst with Shayle Kann

Show Notes

A decade ago, DERs were hot. The hype was that things like batteries, smart devices, and other distributed energy technologies would offset the need for expanding traditional grid infrastructure.

But DERs never took off, at least not at the scale that many hoped for. They had high price tags and short track records compared to the existing substations, transmission lines, and generation options that utilities were familiar with. In short, the market didn’t need them yet.

Fast forward 10 years, and things have changed. Load growth is increasing while major grid bottlenecks — like in transmission, interconnection, and supply chains — may be opening up a new opportunity.

So is the time finally right for DERs? In this episode, Shayle talks to his colleague Andy Lubershane, partner and head of research at Energy Impact Partners. Last week, Andy published a blog post making the case that DERs were a good idea that was just too early, but the market is ready now. Original episode date: 9/18/2025.

Shayle and Andy cover topics like:

- What held DERs back a decade ago

- Why now is different, including falling system costs and growing grid bottlenecks

- The difference between demand response and virtual power plants

- The potential hurdles to scale, like supply chain bottlenecks, foreign entity of concern regulations, and fire codes

Resources:

Latitude Media: Can distributed energy answer AI’s power problem?

Open Circuit: The grid flexibility solutions staring us in the face

Catalyst: Making DERs work for load growth

Credits: Hosted by Shayle Kann. Produced and edited by Daniel Woldorff. Original music and engineering by Sean Marquand. Stephen Lacey is our executive editor.

This episode of Catalyst is brought to you by ENGIE, the smarter energy supplier. ENGIE doesn't just provide the power to run your business — they supply the energy to move it forward, with reliable, flexible solutions built for what's next. Learn more at engieresources.com.

Catalyst is brought to you by EnergyHub. Peak season puts every grid to the test — and the utilities that pass are the ones that built flexible capacity before they needed it. EnergyHub works with more than 170 utilities to coordinate 2.5 million devices and 3.4 gigawatts of dispatchable flexibility through a single platform designed to perform when it counts most. See what that looks like at EnergyHub.com.

Catalyst is brought to you by Bloom Energy. Bloom Energy fuel cells deliver affordable, ultra-reliable onsite power for hospitals, utilities, and data centers – at speed and at scale. Learn more by visiting BloomEnergy.com.

More from Catalyst with Shayle Kann

Oct 15, 2026

As data center-driven load growth continues to rise, hyperscalers are turning to natural gas – both in front of and behind the meter — to secure power. But whether the natural gas pipeline system has the bandwidth to support this surging demand remains far from certain.

Oct 8, 2026

Of all the concerns surrounding the AI boom, data center water usage tops the list. Opponents claim that massive hyperscaler facilities threaten local drinking supplies and drain aquifers. Proponents say data centers use a negligible amount of water, at least compared to agriculture or conventional power generation sources.

Oct 1, 2026

It’s been a wild few years for grid-scale batteries in Texas. At the start of the decade, the Lone Star State was home to roughly 200 megawatts of battery capacity. Today, that number has skyrocketed to seventeen gigawatts…with at least five more gigawatts expected to come online by the end of 2026.

Sep 28, 2026

This is a partner episode, brought to you by Bloom Energy.

Sep 24, 2026

Dual-use technologies and the rise of defense tech are having a moment. But how does the defense sector approach innovations in energy that may be necessary to optimize its fleets?

See all episodes →