
Show Notes
In 2014, Drew Baglino was helping build Tesla's energy division with a passionate, scrappy team. Using parts from Tesla's vehicles, they created the first Powerwall home battery. But as demand grew, they hit a critical bottleneck: cell shortages.
Customers across multiple markets were already excited about the new product, but Drew’s team struggled to keep up with demand. With Powerwall 2 already announced, pressure mounted while the supply chain faltered. And with Tesla prioritizing vehicles,, the energy team was left to "get the scraps and figure it out".
In this episode, Lara Pierpoint talks with Drew Baglino, former senior vice president of powertrain and energy at Tesla, about building a new product category through bootstrapping and creative resource sharing. Drew shares how a couple dozen "Swiss Army knife" engineers created a residential battery system that would ultimately define the market.
Credits: Hosted by Lara Pierpoint. Produced by Erin Hardick. Edited by Anne Bailey and Stephen Lacey. Original music and engineering by Sean Marquand. Stephen Lacey is executive editor.
The Green Blueprint is a co-production of Latitude Media and Trellis Climate. Subscribe on Apple, Spotify, or anywhere you get podcasts. For more reporting on the companies featured in this podcast, subscribe to Latitude Media's newsletter.
More from The Green Blueprint
This week, we’re presenting a drop-in episode of Critical Capital, a new partner podcast from Crux and Latitude Studios.
While living in Delhi, Sorin Grama gave a window air conditioner to an employee. He found out weeks later she wasn't using it because the electricity costs were too high. It was a stark reminder that access to global cooling isn't about upfront equipment costs. It’s about the high electricity costs needed to run air conditioners.
When David Fauvre and his co-founder entered the battery space in 2015, they started as brokers exporting American battery waste to recycling partners in Korea and Japan. But as the industry grew, shipping companies increasingly refused to transport the hazardous materials, making it clear that the U.S. desperately needed its own domestic processing capabilities.
“Good fires" naturally regenerate forests. But a rise in high-severity blazes in the American West are leaving behind barren moonscapes filled with dead trees. These scorched trees act as hazardous fuel for future fires, but clearing them to replant the landscape is astronomically expensive. Add to that a massive shortage in the conifer seed supply chain, and land managers simply don't have the resources to regenerate these forests on their own.
To build the physical infrastructure of the clean energy transition — from wind turbines and grid stabilization to massive new AI data centers — the world needs more copper between now and 2050 than humanity has produced in its entire history. But new copper mines take anywhere from 10 to 16 years to permit and build, meaning we’re not on track to meet our rapidly growing demand.