In May 2024, Yanni Tsipis was watching as his team prepared to pour a low-carbon version of concrete — one that had never been used in a commercial project. As senior vice president of WS Development, he was in charge of the team building Boston’s largest net-zero office building for operating emissions (not embodied emissions), and he had spearheaded an effort to use a new type of low-carbon cement from a startup called Sublime Systems. It's hard to understate how big of a deal it is for the construction industry to try a new version of cement. It’s the glue that holds concrete particles together, and the recipe used today has barely changed since 1824. It's incredibly versatile stuff, but making it accounts for nearly 8% of global emissions, so there's pressure on the industry to clean up. But with the literal foundations of buildings, bridges, and roads at stake, you can understand why the industry might be slow to change. But Yanni's team wanted to try. In this episode, Lara talked to Yanni about the journey to the first commercial deployment of this low-carbon cement. He talks about the economics of cement, securing enough material in time to meet construction deadlines, and earning buy-in from WS Development’s internal team, plus their long list of contractors and subcontractors. It’s a case study in finding the right customer for a first-of-a-kind climate tech project. Credits: Hosted by Lara Pierpoint. Produced by Daniel Woldorff and Erin Hardick. Edited by Anne Bailey and Stephen Lacey. Original music and engineering by Sean Marquand. Stephen Lacey is executive editor. The Green Blueprint is a co-production of Latitude Media and Trellis Climate. Subscribe on Apple, Spotify, or anywhere you get podcasts. For more reporting on the companies featured in this podcast, subscribe to Latitude Media's newsletter. On February 19th, join Latitude Media and Crux Climate for their upcoming Frontier Forum to unpack Crux’s 2024 Transferable Tax Credit Market Intelligence Report. Learn how tax credit transferability is accelerating investment in energy, and gain insights into what is shaping the market’s growth through 2025 and beyond. Register today for this virtual event.
More from The Green Blueprint
This week, we’re presenting a drop-in episode of Critical Capital, a new partner podcast from Crux and Latitude Studios.
While living in Delhi, Sorin Grama gave a window air conditioner to an employee. He found out weeks later she wasn't using it because the electricity costs were too high. It was a stark reminder that access to global cooling isn't about upfront equipment costs. It’s about the high electricity costs needed to run air conditioners.
When David Fauvre and his co-founder entered the battery space in 2015, they started as brokers exporting American battery waste to recycling partners in Korea and Japan. But as the industry grew, shipping companies increasingly refused to transport the hazardous materials, making it clear that the U.S. desperately needed its own domestic processing capabilities.
“Good fires" naturally regenerate forests. But a rise in high-severity blazes in the American West are leaving behind barren moonscapes filled with dead trees. These scorched trees act as hazardous fuel for future fires, but clearing them to replant the landscape is astronomically expensive. Add to that a massive shortage in the conifer seed supply chain, and land managers simply don't have the resources to regenerate these forests on their own.
To build the physical infrastructure of the clean energy transition — from wind turbines and grid stabilization to massive new AI data centers — the world needs more copper between now and 2050 than humanity has produced in its entire history. But new copper mines take anywhere from 10 to 16 years to permit and build, meaning we’re not on track to meet our rapidly growing demand.