The Data Center Daily

Meta Books AI Data Center Chips as an IRS Experiment; Michigan Locks Google Into 20-Year DTE Terms — October 06, 2026

The Data Center Daily

Show Notes

The New York Times reports Meta has claimed billions in research tax credits by treating its AI data centers as experimental pilot models. Plus Michigan's conditional approval of DTE's Google contracts, MISO's 120-day study for paired large loads and generation, TeraWulf's 1 GW Muskie contract, and a cooler IPO window for data center builders.

In this episode: 1. How Meta uses AI data centers to avoid billions in federal taxes | The Seattle Times — Kashmir Hill, Jesse Drucker, Eli Tan, Mike Isaac https://www.seattletimes.com/business/how-meta-uses-ai-data-centers-to-avoid-billions-in-federal-taxes/ 2. MPSC Approves Electric Energy Contracts For Data Center - MetroDetroitToday.com — MetroDetroitToday.com https://www.metrodetroittoday.com/news/business/mpsc-approves-electric-energy-contracts-for-data-center 3. MISO proposes fast-track large load, generation study process | Utility Dive — Ethan Howland https://www.utilitydive.com/news/miso-large-load-generation-study-lars-ferc/832114/ 4. TeraWulf Doubles Muskie Contracted Power to 1 GW as AI Demand Pulls 500 MW Forward by a Year | AI Industry Today — AI Industry Today https://aiindustrytoday.com/news/terawulf-doubles-muskie-contracted-power-to-1-gw-as-ai-demand-pulls-500-mw-forward-by-a-year/ 5. Wall Street is growing skeptical of the data center boom — Maureen Farrell https://www.inquirer.com/business/data-centers-wall-street-backlash-skepticism-investors-build-20261004.html

Follow and rate The Data Center Daily on Apple Podcasts or Spotify. Feedback? Email [email protected]

More from The Data Center Daily

Oct 22, 2026

Entergy Arkansas and Google amend their West Memphis power deal to resolve an accounting fight over ratepayer charges while adding a 440 MW solar PPA, 1.4 GWh of batteries and new transmission. Also: Musk's 10 GW compute claim for SpaceXAI, TCEQ pulling its permit portal offline, and $35 billion of Chinese orders for an Nvidia workstation GPU.

Oct 21, 2026

PJM filed a FERC study agreement to evaluate roughly 9.6 GW of new data center load and 10.2 GW of generation at SB Energy's Flagship site in Pike County, Ohio, outside its interconnection queue. Also: AEP, X-energy and Amazon eye 960 MW of Xe-100 reactors in Indiana, Texas's data center permit freeze draws scrutiny, and Memphis deadlocks on a moratorium.

Oct 19, 2026

NiSource signs a 20-year, 1,100 MW supply deal with Microsoft, funded by Microsoft, and NERC's computational-load standards clear their final ballot. Plus AEP's $4 billion fuel cell plant for Google in Wyoming and a 7.5 GW gas campus in a Utah water filing.

Oct 14, 2026

Oregon's governor has paused air and water permits for data centers until July 2027, and DOE issued a heat-driven emergency order for PJM. Plus FERC's split vote on Duke's large-load transmission rules and Microsoft's multi-gigawatt plan for its Maia inference chips.

Oct 13, 2026

Google lands two power paths. Indiana regulators approved AES Indiana's $1.3 billion solar, storage and wires plan for its 390 MW Monrovia campus, the first test of the state's 80% large-load cost law. Separately, Constellation will spend $4.3 billion uprating 11 PJM reactors by 890 MW.

See all episodes →