
Show Notes
Dynamic pricing is everywhere – and impacts all of us. Whether it's the time of day, your location, or the amount of demand, so many of our decisions are driven by real-time pricing changes. But it's still a relatively new concept in electricity. This week, we're featuring a conversation with Scott Engstrom of GridX and Economist Ahmad Faruqui on the imperative for good rate design – and the consequences of getting it wrong. How do we create dynamic rates that are fair, transparent, and effective at valuing distributed resources? And how do we use technology to design and implement those rates – and perhaps eventually automate them on a real-time basis, as many hope? This episode was recorded live as part of our Frontier Forum series. Watch the full video here.
More from The Green Blueprint
This week, we’re presenting a drop-in episode of Critical Capital, a new partner podcast from Crux and Latitude Studios.
While living in Delhi, Sorin Grama gave a window air conditioner to an employee. He found out weeks later she wasn't using it because the electricity costs were too high. It was a stark reminder that access to global cooling isn't about upfront equipment costs. It’s about the high electricity costs needed to run air conditioners.
When David Fauvre and his co-founder entered the battery space in 2015, they started as brokers exporting American battery waste to recycling partners in Korea and Japan. But as the industry grew, shipping companies increasingly refused to transport the hazardous materials, making it clear that the U.S. desperately needed its own domestic processing capabilities.
“Good fires" naturally regenerate forests. But a rise in high-severity blazes in the American West are leaving behind barren moonscapes filled with dead trees. These scorched trees act as hazardous fuel for future fires, but clearing them to replant the landscape is astronomically expensive. Add to that a massive shortage in the conifer seed supply chain, and land managers simply don't have the resources to regenerate these forests on their own.
To build the physical infrastructure of the clean energy transition — from wind turbines and grid stabilization to massive new AI data centers — the world needs more copper between now and 2050 than humanity has produced in its entire history. But new copper mines take anywhere from 10 to 16 years to permit and build, meaning we’re not on track to meet our rapidly growing demand.