Show Notes
Third-party firmware on WhatsMiner didn't exist. Now it does. Brandon McWard (Associate Product Manager, Firmware at Luxor) joins me on site — you can hear the ASICs — to walk through LuxOS running on an M50S+, live screen share, feature by feature. We cover why MicroBT stock firmware has been a closed box for years, how Advanced Thermal Management replaces the binary "sensor trips, machine off" logic, why changing a power target on stock firmware costs you a full reboot and retune, and the niche feature built for one oil field client: Hash on Disconnect, which keeps machines hashing synthetic work so the generator never takes the load swing. Plus chip-level temperature grids, the overhauled logs, the 2.8% fee structure, and what's actually different under the hood between Bitmain and MicroBT tuning. This is one to watch, not just listen to.
👤 Guest: Brandon McWard — Associate Product Manager, Firmware @ Luxor Luxor: https://luxor.tech LuxOS firmware: https://luxor.tech/mining/firmware Compatible miners: https://docs.luxor.tech/firmware/compatibility
Timestamps:
0:00 Intro & why third-party firmware on MicroBT is rare 6:20 Stock MicroBT firmware: the closed box problem 10:10 Time to tune & why power target changes cost you hashrate 19:00 What role AI actually plays in firmware development 22:00 GUI walkthrough: LuxOS running on an M50S+ 34:00 Board target, hot & dangerous temperature explained 37:20 Save the generator, not the miner: Hash on Disconnect 45:00 Top 2 features for WhatsMiner operators + LuxOS fees
🛠 Sponsored by: Luxor — Mining pool, firmware, hardware trading & hashrate tools https://luxor.tech/
Altair Technology — ASIC hardware, replacement parts & mining infrastructure Code: HASHRATEUP https://altairtech.io/aff/125/
📊 HashrateUp Hardware Deals: https://t.me/hashrateup 📩 Free 5-Day Bitcoin Mining Course: https://hashrateup.com/newsletter-sign-up/
#BitcoinMining #LuxOS #Luxor #WhatsMiner #MicroBT #ASICFirmware #MiningFirmware #ThermalManagement #Curtailment #M50S #Bitcoin #HashrateUp
More from HashrateUp - A Bitcoin Mining Podcast
HashrateUp Hydro Hosting is live: enterprise-grade, hydro-cooled hosting in Texas, now open to small miners starting at just one machine. 👉 Get started: https://hashrateup.com
Public Bitcoin miners shed about 75 EH/s in the first half of 2026, roughly $1.5 billion worth of mining hardware, as their power moves to AI. In this NEWS episode, Jesse breaks down who is leaving, where the hashrate is going and what it means for the miners who stay.
Cheap power means nothing if the government turns against you. Giannis Andreou, CEO of Bitmern Mining, started hosting Bitcoin miners in the UAE on agricultural power below 6¢/kWh, was forced out when the government banned that power, moved to Ethiopia, and is now watching the same story repeat as the Ethiopian government takes over mining and large operators pack up and leave.
Texas is ending 4CP. The incentive that saved flexible miners roughly $50,000 per MW per year is likely in its final season, and ERCOT is moving toward 12CP by 2028. Haley Thomson, Director of Energy at Luxor, explains what that means for Bitcoin miners and who ends up paying for the grid.Haley breaks down how 4CP actually works, why firm loads are pushing for change, and how 18+ GW of new battery storage has compressed capacity prices across ERCOT. We also cover why Bitcoin mining is close to the perfect grid-balancing load, how batteries and miners compare as grid assets, and how Luxor performed what's likely the first 4CP curtailment of GPUs in ERCOT.We also walk through the Luxor Energy dashboard live, from tracking load against breakeven to iMiner underclocking, 4CP buffer settings and what it really costs to be online during a peak. At the time of recording, 4CP season 2026 was likely already over.This episode is not sponsored by Luxor. Nothing discussed is financial advice. Do your own diligence before making energy or mining decisions.Guest: Haley Thomson, Director of Energy at Luxor TechnologyLuxor Energy: https://luxor.tech/energyHaley on Hashrate Index: https://hashrateindex.com/blog/author/haley/Luxor: https://luxor.techTimestamps:0:00 Intro0:45 Can AI provide grid flexibility?1:31 The first GPU 4CP curtailment in ERCOT3:45 What 4CP is worth: ~$50K per MW per year6:02 How 4CP works and who pays for the grid8:54 Why Bitcoin mining is the perfect flexible load11:45 Adding 60 GW of renewables: the transmission bottleneck14:00 Why firm loads want 4CP gone16:43 How miners lower off-peak energy prices20:57 Renewables, congestion and transmission costs24:54 12CP explained: what changes for miners29:29 Curtailing at $0 power: the solar mismatch31:04 How 18 GW of batteries reshaped ERCOT36:22 Battery vs Bitcoin mine39:10 Capex: batteries vs hydro vs air-cooled mining41:49 Luxor Energy dashboard walkthrough43:54 iMiner: raising breakeven from $75 to $90/MWh45:28 4CP buffer settings and risk48:58 What missing a 4CP peak really costs51:54 The AI pivot and tier-zero data centers55:11 Where to find Haley and Luxor EnergySponsored by:Altair Technology. ASIC hardware, replacement parts and mining infrastructureCode: HASHRATEUPhttps://altairtech.io/aff/125/HashrateUp Hardware Deals: https://t.me/hashrateupFree 5-Day Bitcoin Mining Course: https://hashrateup.com/newsletter-sign-up/#BitcoinMining #ERCOT #4CP #LuxorEnergy #HashrateUp
Matteo Spinosa, founder and CEO of Doefin, built the first accessible prediction market for Bitcoin miners to hedge difficulty. Doefin lets miners and traders take a directional view on network hashrate — or lock in revenue certainty before difficulty spikes — using a Polymarket-style venue where price equals probability.